IDG Contributor Network: The critical path to success for the Always Connected PC

Full Article :

Computerworld -

I’m a believer in the concept of the Always Connected PC largely because it fits very well into the way I work. I prefer a desktop system when I’m at home and even build my own systems. But when I’m on the road, I mostly write, browse the web and consume content. The reduction in performance for this platform doesn’t bother me as a result because I need the thing to be light, have long battery life and be something I can be proud of.

This Always Connected PC is a huge joint initiative by both Qualcomm and Microsoft (disclosure, both

Leave a Comment

%d bloggers like this: